By John Ezovski
A secure storage area between two containers was completed this past week.
Work included installing gutters along the roof edge, installation of the roof,
attaching chain link fencing along the back, fabrication and installation of
double gates at the entrance.
With the storage area complete, all remaining material was removed from the
women's restroom and deep sink area. The locomotives pistons that were
stored in the men's room entrance area were moved into the outdoor shop
area.
Two and one half panels of track were leveled in preparation of the final move
of the tender and caboose.
While materials were being moved and track leveled, the small shaper/planner
received some much needed attention. Various oil lines were replaced, and
the machine tested.
In addition, grass (weeds) in and adjacent to the new site were cut.
The end of the move is here! By the end of this coming week, all remaining
CTRC equipment (exclusive of the turntable and water tank) should be within
the county designated area.
|