SP2479 frame spring rigging removed
Date: 04/01/2004
Views: 250
|
Spring rigging damaged pin hole #1 driver
Date: 04/01/2004
Views: 170
|
Spring rigging damaged pin hole #2 driver.
Date: 04/01/2004
Views: 181
|
Weld repair of pin holes on frame in preparation for boring.
Date: 04/01/2004
Views: 246
|
|
Grinding prior to boring.
Date: 04/01/2004
Views: 171
|
Boaring bar base plate installed on Locomotive frame.
Date: 04/01/2004
Views: 262
|
Installation of boring bar
Date: 04/01/2004
Views: 182
|
Frame boring of spring rigging holes
Date: 04/01/2004
Views: 173
|
|
Each set of holes required 4 setups to complete the boring of 2 holes
Date: 04/01/2004
Views: 180
|
Each hole bored required 8 to 10 hours to complete
Date: 04/01/2004
Views: 175
|
Boaring bar in action
Date: 04/01/2004
Views: 239
|
Mag base drill was used to drive the boring bar.
Date: 04/01/2004
Views: 417
|
|
Manufacture of new pins for spring rigging.
Date: 04/02/2004
Views: 200
|
Pin Manufacturing
Date: 04/02/2004
Views: 208
|
Link reboring
Date: 04/02/2004
Views: 181
|
Spring linkage reboring
Date: 04/02/2004
Views: 164
|