SP2479 frame spring rigging removed
Date: 04/01/2004
Views: 365
|
Spring rigging damaged pin hole #1 driver
Date: 04/01/2004
Views: 243
|
Spring rigging damaged pin hole #2 driver.
Date: 04/01/2004
Views: 247
|
Weld repair of pin holes on frame in preparation for boring.
Date: 04/01/2004
Views: 333
|
|
Grinding prior to boring.
Date: 04/01/2004
Views: 256
|
Boaring bar base plate installed on Locomotive frame.
Date: 04/01/2004
Views: 393
|
Installation of boring bar
Date: 04/01/2004
Views: 261
|
Frame boring of spring rigging holes
Date: 04/01/2004
Views: 254
|
|
Each set of holes required 4 setups to complete the boring of 2 holes
Date: 04/01/2004
Views: 248
|
Each hole bored required 8 to 10 hours to complete
Date: 04/01/2004
Views: 260
|
Boaring bar in action
Date: 04/01/2004
Views: 354
|
Mag base drill was used to drive the boring bar.
Date: 04/01/2004
Views: 540
|
|
Manufacture of new pins for spring rigging.
Date: 04/02/2004
Views: 277
|
Pin Manufacturing
Date: 04/02/2004
Views: 290
|
Link reboring
Date: 04/02/2004
Views: 260
|
Spring linkage reboring
Date: 04/02/2004
Views: 246
|