|
SP2479 frame spring rigging removed
Date: 04/01/2004
Views: 356
|
Spring rigging damaged pin hole #1 driver
Date: 04/01/2004
Views: 235
|
Spring rigging damaged pin hole #2 driver.
Date: 04/01/2004
Views: 241
|
Weld repair of pin holes on frame in preparation for boring.
Date: 04/01/2004
Views: 320
|
|
Grinding prior to boring.
Date: 04/01/2004
Views: 242
|
Boaring bar base plate installed on Locomotive frame.
Date: 04/01/2004
Views: 375
|
Installation of boring bar
Date: 04/01/2004
Views: 249
|
Frame boring of spring rigging holes
Date: 04/01/2004
Views: 244
|
|
Each set of holes required 4 setups to complete the boring of 2 holes
Date: 04/01/2004
Views: 232
|
Each hole bored required 8 to 10 hours to complete
Date: 04/01/2004
Views: 255
|
Boaring bar in action
Date: 04/01/2004
Views: 347
|
Mag base drill was used to drive the boring bar.
Date: 04/01/2004
Views: 530
|
|
Manufacture of new pins for spring rigging.
Date: 04/02/2004
Views: 272
|
Pin Manufacturing
Date: 04/02/2004
Views: 285
|
Link reboring
Date: 04/02/2004
Views: 254
|
Spring linkage reboring
Date: 04/02/2004
Views: 240
|